Modeling construction time in Spanish building projects

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10045/37728
Información del item - Informació de l'item - Item information
Título: Modeling construction time in Spanish building projects
Autor/es: Guerrero Lázaro, Miguel Ángel | Villacampa, Yolanda | Montoyo, Andres
Grupo/s de investigación o GITE: Procesamiento del Lenguaje y Sistemas de Información (GPLSI) | Modelización Matemática de Sistemas
Centro, Departamento o Servicio: Universidad de Alicante. Departamento de Lenguajes y Sistemas Informáticos | Universidad de Alicante. Departamento de Matemática Aplicada
Palabras clave: Forecasting | Time | Building projects | Construction speed | Construction cost | Regression analysis
Área/s de conocimiento: Lenguajes y Sistemas Informáticos | Matemática Aplicada
Fecha de publicación: jul-2014
Editor: Elsevier
Cita bibliográfica: International Journal of Project Management. 2014, 32(5): 861-873. doi:10.1016/j.ijproman.2013.09.009
Resumen: The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.
Patrocinador/es: The study presented in this paper was mainly funded by a research grant awarded by the Office of the Vice President for Research, Development and Innovation of the University of Alicante (resolution 22 December 2011). It has also been partially funded by the Spanish Government through the project TEXTMESS 2.0 (TIN2009-13391-C04) and by the Valencian Government through the project PROMETEO (PROMETEO/2009/199).
URI: http://hdl.handle.net/10045/37728
ISSN: 0263-7863 (Print) | 1873-4634 (Online)
DOI: 10.1016/j.ijproman.2013.09.009
Idioma: eng
Tipo: info:eu-repo/semantics/article
Revisión científica: si
Versión del editor: http://dx.doi.org/10.1016/j.ijproman.2013.09.009
Aparece en las colecciones:INV - GPLSI - Artículos de Revistas
INV - MMS - Artículos de Revistas

Archivos en este ítem:
Archivos en este ítem:
Archivo Descripción TamañoFormato 
Thumbnail2014_Guerrero_etal_IJPM_final.pdfVersión final (acceso restringido)998,66 kBAdobe PDFAbrir    Solicitar una copia


Todos los documentos en RUA están protegidos por derechos de autor. Algunos derechos reservados.