Engineer Leandro Badarán’s project to safeguard the fortresses of Alicante in 1794

Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10045/56437
Información del item - Informació de l'item - Item information
Título: Engineer Leandro Badarán’s project to safeguard the fortresses of Alicante in 1794
Autor/es: Echarri-Iribarren, Víctor
Grupo/s de investigación o GITE: Tecnología y Sostenibilidad en Arquitectura
Centro, Departamento o Servicio: Universidad de Alicante. Departamento de Construcciones Arquitectónicas
Palabras clave: Fortifications | Military engineers | Jorge Próspero de Verboom | Leandro Badarán | Francisco Sabatini | Alicante
Área/s de conocimiento: Construcciones Arquitectónicas
Fecha de publicación: 2016
Editor: WIT Press
Cita bibliográfica: WIT Transactions on The Built Environment. 2016, 158: 1-12. doi:10.2495/DSHF160011
Resumen: After the construction of the San Carlos bastion in Alicante in the final decade of the seventeenth century, and the great trench which the English built around the district of San Francisco during their years of dominance in the War of Succession, the waters of the San Blas gully caused serious damage to these fortifications of the city and to the trade buildings of the port. In 1772, the diversion canal was built. It was designed to divert the riverbed of the gully and send the waters directly to the sea. The project had been initially designed by the Engineer General, Jorge Próspero de Verboom in 1721. This unique work of engineering had some defects, principally in the breakwater which prevented the waters from flowing down the former river course. On several occasions, the water returned to its original riverbed due to the weakness of the breakwater, the narrowness of the channel’s bed and its lack of regularisation, causing serious damage to the bastion, the Babel-facing façade, the traders’ warehouses and other buildings. This study describes the project that the military engineer Leandro Badarán carried out in 1794 in order to technically improve this canal and examines his report on the state of the fortifications. Similar works built in Spain are also explained. It also analyses the repeated disputes between the war department and the port throughout these years over finding a technical solution to the problem.
URI: http://hdl.handle.net/10045/56437
ISSN: 1746-4498 (Print) | 1743-3509 (Online)
DOI: 10.2495/DSHF160011
Idioma: eng
Tipo: info:eu-repo/semantics/article
Derechos: © 2016 WIT Press
Revisión científica: si
Versión del editor: http://dx.doi.org/10.2495/DSHF160011
Aparece en las colecciones:INV - TSA - Artículos de Revistas

Archivos en este ítem:
Archivos en este ítem:
Archivo Descripción TamañoFormato 
Thumbnail2016_Echarri_DSHF.pdf3,43 MBAdobe PDFAbrir Vista previa


Todos los documentos en RUA están protegidos por derechos de autor. Algunos derechos reservados.